Schmidt, W. P.
William P. Schmidt is the Technology Manager for LNG Process Engineering. This includes developing and maintaining the process design methods, project and field support, technical risk management, and troubleshooting. Mr. Schmidt has 43 years of process engineering experience, including air separation, non-cryogenic gas separations, computer model development, and the past 14 years have been in LNG. He is co-inventor on 11 US patents and has 44 external publications. He received Chemical Engineering degrees from Case Western Reserve University (B.S.) and Lehigh (M.S.).
Take the mystery out of running your LNG plant
Gas Processing/LNG
/ Process Control
/ Process Optimization
/ Refining
/ Compressors
/ Engineering & Design
/ Heat Transfer
/ Information Systems
/ Natural Gas
Many natural gas liquefaction plants with production capacities ranging from 0.5 MMtpy to 8 MMtpy use mixed refrigerants to cool and liquefy the feed.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction