Crossland, B.
Bonnie Crossland is a Product Manager for Rosemount gas chromatographs with Emerson. She earned a BS degree in engineering from Rutgers University and an MBA degree from the University of South Carolina, and is also a member of the International Society of Automation (ISA).
40 CFR Part 63: Three possible solutions, one balanced choice
By January 30, 2019, the 40 CFR Part 63 Subpart CC rule by the US Environmental Protection Agency (EPA) requires petroleum refinery owners or operators of flares used as control devices for emissions points to meet the requirements of §63.670, regardless of the construction date of the flare.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Perpetual Next appoints Bilfinger as lead consultant for its Methanol Moerdijk project 4/1
- ASRock Industrial and CSI Validate O-PAS™ Systems Management Architecture with the iEP-7020E and AiSMA 4/1
- Heavy equipment for KazMunayGas' Atyrau PE plant ships from Shanghai to Kazakhstan 4/1
- KT Tech awarded early engineering works contract for 60,000-tpy SAF plant in Indonesia 4/1
- OCI Global completes sale of OCI Ammonia Holding to AGROFERT 4/1
- Union workers ratify contract at ExxonMobil's Louisiana (U.S.) refining and chemical complex 4/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

