Beebe, D.
Dustin Beebe is the Vice President of Performance Software for Emerson. He is responsible for aligning the global control performance, operator performance and simulation businesses and the strategy synergy between Emerson and AspenTech. Before joining Emerson, Beebe served as the President of ProSys until Emerson acquired it in 2018. He has been in the industrial automation business since 1996. Beebe earned a BS degree in chemical engineering from the University of Arkansas in Fayetteville, Arkansas.
Don’t just survive: Thrive with advanced process control
Environment & Safety
/ Process Control
/ Process Optimization
/ Construction
/ Engineering & Design
/ Equipment
/ Information Systems
/ Loss Prevention
There is a new adage in process manufacturing circles, and it resonates particularly deeply in the hydrocarbon industry: If you do not like market factors today, just wait a month.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction