Yahyaabadi, R.
Consider practical conditions for vacuum unit modeling
A good simulation model is a tool that reveals critical operating conditions and can be applied to daily operations
Improve design strategies for refinery vacuum towers
Products yield and specifications with energy conservation goals can determine options to revamp distillation units
Increase distillation capacity with side heaters and coolers
Debottlenecking towers involves close review of product yields while reducing tray flooding and energy consumption
Rethink placement of preflash drum in crude preheat train network
Strategic location of the preflash drum not only resolves network problems, but, in some cases, reduces operating costs
Solving hydraulic problems in crude preheat train networks
Heat transfer and hydraulic problems need to be considered simultaneously
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction