Moon, J.
Jongkyung Moon is a Process Engineer at GS Engineering and Construction’s Plant Basic Engineering Group in Seoul, South Korea. He has more than 12 yr of process engineering experience in the refining, petrochemicals and oilsands industries, including several grassroots and revamp projects. He holds a BS degree in chemical engineering from Seoul National University.
Use an Excel-based method to evaluate performance for the preheat train of a CDU
A rigorous and accurate performance evaluation of existing equipment is a key factor for the success of a plant revamp study.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Fertiglobe, Covestro and TA’ZIZ sign MoU to explore strategic ammonia collaboration 2/9
- S-Oil signs nearly $4-B PE marketing deal with SABIC 2/9
- Indonesia's Pertamina launches $7-B natural resources processing initiative 2/9
- Digital Exclusive: Innovative grassroots CDU-VDU configuration—Pioneering energy efficiency and net-zero pathways in modern refineries 2/9
- Update: Union agrees to U.S. refineries contract, averting nationwide strike 2/9
- Schneider Electric unveils EcoStruxure™ Foxboro software defined automation 2/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

