Moon, P.
Failure analysis of an ethylene cracking heater finned tube
Here's what caused the leak and the steps taken to prevent future leaks
Failure analysis of ethylene cracking heater convection section dilution steam tube
Several inspection techniques were required to determine the root cause of the failure
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Fertiglobe, Covestro and TA’ZIZ sign MoU to explore strategic ammonia collaboration 2/9
- S-Oil signs nearly $4-B PE marketing deal with SABIC 2/9
- Indonesia's Pertamina launches $7-B natural resources processing initiative 2/9
- Digital Exclusive: Innovative grassroots CDU-VDU configuration—Pioneering energy efficiency and net-zero pathways in modern refineries 2/9
- Update: Union agrees to U.S. refineries contract, averting nationwide strike 2/9
- Schneider Electric unveils EcoStruxure™ Foxboro software defined automation 2/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

