Griffiths, E.
Edward Griffiths is a Technology Manager for K-SAAT™ alkylation technology at KBR. He has 13 yr of refining and petrochemicals experience in process engineering, plant operations and technology licensing. Mr. Griffiths earned an MEng degree in chemical and process engineering from Newcastle University, UK.
Meeting the Tier 3 challenge with ultra-clean alkylate
Environment & Safety
/ Process Optimization
/ Refining
/ Catalysts
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Gasoline
/ Octane
/ Reactors
/ Sulfur
/ Treating
/ Americas
The U.S. Environmental Protection Agency (EPA) introduced Tier 3 gasoline sulfur standards in 2017, requiring all U.S. gasoline producers to adhere to an annual 10-ppm average sulfur limit.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- bp's Gelsenkirchen refinery attracts buyer's interest from Klesch 2/10
- Fire at Baiji refinery contained, Iraq's Somo says 2/10
- Hengli Petrochemical sets up Dubai trading subsidiary in expansion 2/10
- Canadian airlines suspend Cuba flights as island set to run out of jet fuel 2/10
- Idemitsu Kosan plans maintenance at Keihin refinery in April 2/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

