Y. Ha
Case study: Why did the tube sheet of the waste heat boiler deform?
This article analyzes the causes of a 19-mm protrusion of the tube sheet and the tube joint leaks that occurred within a sulfur recovery unit (SRU) waste heat boiler (WHB).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras delivers LPG sold at steep premiums despite Lula move to annul auction 4/3
- Plug Power to supply 275-MW GenEco electrolyzer system for Hy2gen’s Courant decarbonized ammonium nitrate project 4/3
- Vietnam refinery boosting jet fuel production 4/3
- China plans to upgrade some petrochemical plants, phase out others by 2029 4/3
- Morocco has diesel stocks for 51 days, energy ministry says 4/3
- Nigeria's Seplat Energy hit by strike amid push for higher output 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction