Allen, B.
Brad Allen is a Certified Water Technologist based out of Calgary, Alberta, Canada. As a Senior Technical Services Manager for Pace Solutions, he is experienced in every aspect of industrial water treatment. Part technician and part investigator, he enjoys taking a hands-on approach toward problem finding and resolution for each unique water system he services.
Upkeep down the pipe: Plant shutdowns and water treatment
The maintenance checklist for a plant shutdown can sometimes look intimidating and, in the face of a short timeline, unnerving.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction