Moreno, C. G.
Carlos García Moreno is a Senior Consultant with more than 18 yr of experience in the oil and gas industry. He started his career as a Production Supervisor in an NGL fractionation plant with Pluspetrol Peru Co. Recently, he developed his career in marine terminals with Oiltanking Peru S.A. and Solgas S.A. He earned a BS degree in petrochemical engineering from the National University of Engineering (Peru), an MBA from Centrum Católica Business School and an MS degree in project management from ESAN Business School.
Alarm management: A pillar of process safety management
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Refining
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Management
/ Safety
The following describes how an adequate implementation of alarm management is a fundamental part in process safety management (PSM).
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Shell Aviation, Accenture, and Amex GBT expand Avelia into a multi-supplier SAF solution 7/16
- ORLEN and Krajowa Grupa Spożywcza sign MoU to accelerate biomethane production in Poland 7/16
- New plants, U.S. trade worries to drive China's 2025 naphtha imports to record 7/16
- Blue Water significantly reduces CO2 emissions by switching to HVO in port operations 7/16
- Swire Shipping launches new carbon insetting program – ‘Voyage to Zero’ 7/16
- China's surplus crude oil surges in June, giving refiners options 7/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction