Moreno, C. G.
Carlos García Moreno is a Senior Consultant with more than 18 yr of experience in the oil and gas industry. He started his career as a Production Supervisor in an NGL fractionation plant with Pluspetrol Peru Co. Recently, he developed his career in marine terminals with Oiltanking Peru S.A. and Solgas S.A. He earned a BS degree in petrochemical engineering from the National University of Engineering (Peru), an MBA from Centrum Católica Business School and an MS degree in project management from ESAN Business School.
Alarm management: A pillar of process safety management
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Refining
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Management
/ Safety
The following describes how an adequate implementation of alarm management is a fundamental part in process safety management (PSM).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction