Saneep Mahulkar is Group Lead for Cracker Technology at the Center of Excellence at Reliance Industries Ltd. in India. He has been working with Reliance for the past 14 yr in various roles. He supports existing steam cracker sites with troubleshooting and carrying out revamps. He holds an MS degree in chemical engineering from the University of Twente.
Case study: Heat exchanger tube rupture and its impact on metal embrittlement
Process engineers strive to recover as much energy as is practically possible from the available process and utility streams within the constraint of the plant. To achieve this goal, traditional—and sometimes non-traditional—methods are utilized. In a steam cracker, light olefins are considered the highest-value products, and utilizing “cold energy,”
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Perpetual Next appoints Bilfinger as lead consultant for its Methanol Moerdijk project 4/1
- ASRock Industrial and CSI Validate O-PAS™ Systems Management Architecture with the iEP-7020E and AiSMA 4/1
- Heavy equipment for KazMunayGas' Atyrau PE plant ships from Shanghai to Kazakhstan 4/1
- KT Tech awarded early engineering works contract for 60,000-tpy SAF plant in Indonesia 4/1
- OCI Global completes sale of OCI Ammonia Holding to AGROFERT 4/1
- Union workers ratify contract at ExxonMobil's Louisiana (U.S.) refining and chemical complex 4/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction