Al-Gofili, A.
Abdulaziz Al-Gofili works as an Engineering Consultant for Saudi Aramco, specializing in rotating equipment. He has more than 5 yr of experience in rotating equipment operation, maintenance, reliability and selection. Mr. Al-Gofili holds a BE degree in mechanical engineering from King Fahd University for Petroleum and Minerals.
Rotating equipment oil systems optimization guideline
Maintenance & Reliability
/ Process Control
/ Refining
/ Compressors
/ Equipment
/ Gasoline
/ Motors
/ Pumps
/ Rotating Equipment
/ Turbines
/ Utilities
/ Valves
The industry is moving away from oil shaft seals and hydraulic speed control for turbines to advanced alternatives.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Perpetual Next appoints Bilfinger as lead consultant for its Methanol Moerdijk project 4/1
- ASRock Industrial and CSI Validate O-PAS™ Systems Management Architecture with the iEP-7020E and AiSMA 4/1
- Heavy equipment for KazMunayGas' Atyrau PE plant ships from Shanghai to Kazakhstan 4/1
- KT Tech awarded early engineering works contract for 60,000-tpy SAF plant in Indonesia 4/1
- OCI Global completes sale of OCI Ammonia Holding to AGROFERT 4/1
- Union workers ratify contract at ExxonMobil's Louisiana (U.S.) refining and chemical complex 4/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

