Al-Malki, M. A.
is a process engineer for Saudi Aramco and the supervisor of planning and accountability units, where he is in charge of leading a group of professionals to prepare business plans, monitor key performance indicators (KPIs) and evaluate and control fiscal performance. Mr. Al-Malki has been in the oil refining business for 10 years, working in different processing units, including hydrocracking, hydroprocessing and reforming. As a planning engineer, he has also been responsible for evaluating operation levels and production targets. Mr. Al-Malki holds a BS degree in chemical engineering.
Test run with sales gas feed in a traditional H2 plant
A conventional hydrogen (H2) plant in a Middle Eastern refinery was designed to produce 75,000 normal cubed meters per hour (Mnm3/hr) of H2 product with 95% purity with plat offgas feed (platformer offgas mixed with hydrocracker offgas).
- 1
- ... 1 pages
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15

