Al-Sanad, A. (1)
ABDULLMAJEED AL-SANAD is a process engineer at Saudi Aramco's Process and Control Systems Department, Flare and Relief Systems Group. Al-Sanad has 6 yr of experience with Saudi Aramco, including company operations and project support. He also participates in a flaring minimization program, including several aspects such as purge gas optimization studies and flare gas recovery systems evaluations. He earned a BS degree in chemical engineering from King Fahd University of Petroleum and Minerals (KFUPM).
- ... 0 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction