Al-Warthan, A.
Abdullah Al-Warthan is a Process Engineer at Saudi Aramco with demonstrated experience in upstream operations. He has 8 yr of experience in gas operation fields as he led the commissioning of the gas treat unit in one of Saudi Aramco’s main facilities (Fadhili Gas Plant). Prior to that, he was assigned as a Lead Process Engineer at the Khursaniyah Gas Plant. Mr. Al-Warthan holds an energy auditor certificate.
Soft startup of best practices for the commissioning of amine plants
The startup and commissioning of hydrocarbon plants can present unique challenges that, if not anticipated and addressed in the pre-commissioning and commissioning periods, will inhibit plant startup and increase the difficulty of achieving product specifications in a timely manner.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- SIBUR develops new polyethylene grade for FMCG packaging 8/13
- L&T Energy GreenTech partners with Japan’s ITOCHU for 300,000-tpy green ammonia project 8/13
- VINCI wins major contract for innovative biofuels plant in Spain 8/13
- Orlen Unipetrol to shut ethylene unit at Litvinov plant for several days 8/13
- Dangote Refinery cuts fuel price before planned sales to local Nigerian market 8/13
- Chevron Phillips Chemical completes low-viscosity PAO expansion in Belgium 8/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction