Griman, J.
Recover from a steam reformer tube rupture
Most operational problems in the hydrogen plant occur at the steam reformer. The steam reformer is typically operated at high temperatures (810°C process gas) and high pressures (20 atmg) to maxi..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- Fertiglobe, Covestro and TA’ZIZ sign MoU to explore strategic ammonia collaboration 2/9
- S-Oil signs nearly $4-B PE marketing deal with SABIC 2/9
- Indonesia's Pertamina launches $7-B natural resources processing initiative 2/9
- Digital Exclusive: Innovative grassroots CDU-VDU configuration—Pioneering energy efficiency and net-zero pathways in modern refineries 2/9
- Update: Union agrees to U.S. refineries contract, averting nationwide strike 2/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

