Sabban, M.
Mahmoud Sabban has more than 25 yr of experience in oil and gas. He started his career as a plant engineer and has held various positions in facilities planning, commissioning and startup teams; project engineering; technical support; and central engineering. At present, he is a Lead Rotating Equipment Senior Consultant and the gas turbine standards committee Chairman at Saudi Aramco. He is on the board of directors of Gas Turbine Users International and represents the company at the American Petroleum Institute (API) and Gulf Cooperation Council Standards Organization (GSO). He earned an MSc degree in thermal power from Cranfield University in the UK.
Hot oil pump warm-up system best practices and failure case study
Many industries utilize pumps in hot applications, including oil and gas facilities.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction