Talukder, R.
Rajib Talukder is a Process Specialist in the Global Manufacturing Excellence department at Aramco, Saudi Arabia. He has more than 30 yr of experience in process engineering and earned a BTech degree in chemical engineering from NIT Tiruchirappalli, India.
Demystify warm-up practices for centrifugal pumps
Crude oil
/ Desulfurization
/ Engineering & Design
/ Environment
/ Environment & Safety
/ Equipment
/ Loss Prevention
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Pumps
/ Valves
This article provides a thorough analysis of various warm-up practices—examining their benefits and drawbacks and proposing well-grounded guidelines for the development of efficient warm-up systems.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction