Winter, G.
Gabriel Winter is an Engineering Specialist with Saudi Aramco. He has more than 20 yr of experience in the areas of process design, process simulation and optimization. In his current position at Aramco, he works with various departments and business lines to develop applications and solutions, using process simulation and optimization models. He earned a Bch degree in chemical engineering from the University of Texas at Austin.
Enhanced unit monitoring enabled by digital twin
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Hydrocracking
/ Information Systems
/ Loss Prevention
/ Reactors
/ Middle East
Process engineers must continuously monitor the health and performance of process units.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction