Robling, D.
Doug Robling is the Business Development Manager for Schneider Electric’s US Services division. He has been with Schneider Electric for more than 30 yr in various engineering, operations and sales positions. Prior to Schneider Electric, Mr. Robling spent 10 yr with the Public Service Co. of Indiana, an investor-owned gas and electric utility.
Getting onboard with modernization
Environment & Safety
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Refining
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ Management
/ Utilities
While electrical equipment typically has a lengthy lifespan, it is not meant to last, or be relevant, forever.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction