Ethakota, M.
is a head of the Delhi Process and Technology Department for Technip India. He joined Technip Benelux BV, Netherlands in the Process Department in 2002. He was product development manager for the hydrogen and syngas product line. He graduated from Andhra University in 1993 and also earned a master’s degree from IIT Kanpur in 1995.
Use dynamic simulation to increase reliability of hydrogen generation
Through this plant study, a licensor demonstrates effective use of rigorous dynamic simulation tools to implement the new control schemes and configurations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Perpetual Next appoints Bilfinger as lead consultant for its Methanol Moerdijk project 4/1
- ASRock Industrial and CSI Validate O-PAS™ Systems Management Architecture with the iEP-7020E and AiSMA 4/1
- Heavy equipment for KazMunayGas' Atyrau PE plant ships from Shanghai to Kazakhstan 4/1
- KT Tech awarded early engineering works contract for 60,000-tpy SAF plant in Indonesia 4/1
- OCI Global completes sale of OCI Ammonia Holding to AGROFERT 4/1
- Union workers ratify contract at ExxonMobil's Louisiana (U.S.) refining and chemical complex 4/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

