Walter, J. P.
Jonathan P. Walter is the Business Development Manager for TLV Corp. He previously served as general manager of TLV’s International Consulting and Engineering Services group, where he gained extensive experience helping refineries and chemical plants optimize the performance of their steam systems. Mr. Walter earned a BEng degree in electronic engineering from the University of Sheffield in the UK and is a UK Chartered Engineer (CEng). He also holds qualifications as a Certified Energy Manager, a Professional Energy Manager and a U.S. Department of Energy (DOE) Steam Specialist.
Impact plant performance by improving the steam system
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Engineering & Design
/ Equipment
/ Heat Transfer
/ Turbines
Petrochemical plants and refineries face production and profitability challenges on multiple fronts.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction