Dey, P. K.
Integrated approach to materials management: a case study
Business process re-engineering provided a substantial improvement to this function
Integrated approach to materials management: a case study Table 3
  Table 3. Total improvement   ..
Quantitative risk management aids refinery construction
Combining the Analytic Hierarchy Process and decision tree analysis provides an effective means for controlling a complex project
Project management system for a concurrent engineering framework
Case study of a project in India demonstrates how a planning structure was applied to complete the job on a fast track
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- SIBUR develops new polyethylene grade for FMCG packaging 8/13
- L&T Energy GreenTech partners with Japan’s ITOCHU for 300,000-tpy green ammonia project 8/13
- VINCI wins major contract for innovative biofuels plant in Spain 8/13
- Orlen Unipetrol to shut ethylene unit at Litvinov plant for several days 8/13
- Dangote Refinery cuts fuel price before planned sales to local Nigerian market 8/13
- Chevron Phillips Chemical completes low-viscosity PAO expansion in Belgium 8/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction