Fisher, P.
Monitor safety with improved risk performance indicators
Environment & Safety
/ Process Control
/ Information Systems
/ Loss Prevention
/ Management
/ Safety
Using Layer of Protection Analysis (LOPA) and real-time operational data, statistical estimates of the frequencies of future hazardous events can be generated. Combined with a qualitative estimate of the severity of hazardous events and the tolerable frequency determined in the LOPA, an objective leading metric of hazardous events can be created.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

