Gentry, M. R.
Matthew R. Gentry has worked for Airflow Sciences Corp. for more than 15 yr, performing flow modeling as well as laboratory and field testing. He has served as project manager for heat recovery steam generators, waste heat recovery units, selective catalytic reduction and sorbent injection projects, helping optimize performance and pollution control in a wide variety of industrial applications. Mr. Gentry received his MSE degree in Aerospace Engineering from the University of Michigan in 2004, with a specialization in structural mechanics.
Flow modeling as a tool for WHRU performance optimization
Process Optimization
/ Refining
/ Petrochemicals
/ Gas Processing/LNG
/ Heat Transfer
/ Carbon Management
/ Environment & Safety
/ Information Systems
Greenhouse gas (GHG) emissions have become a growing concern for many industrialized countries over the past few years.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- bp's Gelsenkirchen refinery attracts buyer's interest from Klesch 2/10
- Fertiglobe, Covestro and TA’ZIZ sign MoU to explore strategic ammonia collaboration 2/9
- S-Oil signs nearly $4-B PE marketing deal with SABIC 2/9
- Indonesia's Pertamina launches $7-B natural resources processing initiative 2/9
- Digital Exclusive: Innovative grassroots CDU-VDU configuration—Pioneering energy efficiency and net-zero pathways in modern refineries 2/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

