Forbes, B.
Brandon Forbes has 14 yr of experience designing steam and liquid heating systems for refinery and chemical applications. He now oversees product development for Controls Southeast Inc., an AMETEK company. He received his Bch degree in mechanical engineering from the University of North Carolina Charlotte, and obtained his PE while working at CSI.
Strategies to minimize piping thermal maintenance system cost without compromising performance
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Piping
/ Americas
/ Middle East
Where process fluid must be maintained within a certain operating temperature window, the piping will likely require the application of a thermal maintenance system.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- Fertiglobe, Covestro and TA’ZIZ sign MoU to explore strategic ammonia collaboration 2/9
- S-Oil signs nearly $4-B PE marketing deal with SABIC 2/9
- Indonesia's Pertamina launches $7-B natural resources processing initiative 2/9
- Digital Exclusive: Innovative grassroots CDU-VDU configuration—Pioneering energy efficiency and net-zero pathways in modern refineries 2/9
- Update: Union agrees to U.S. refineries contract, averting nationwide strike 2/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

