Forbes, B.
Brandon Forbes has 14 yr of experience designing steam and liquid heating systems for refinery and chemical applications. He now oversees product development for Controls Southeast Inc., an AMETEK company. He received his Bch degree in mechanical engineering from the University of North Carolina Charlotte, and obtained his PE while working at CSI.
Strategies to minimize piping thermal maintenance system cost without compromising performance
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Piping
/ Americas
/ Middle East
Where process fluid must be maintained within a certain operating temperature window, the piping will likely require the application of a thermal maintenance system.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction