Thomerson, C.
Celine Thomerson is a Dynamic Simulation Technical Lead at AVEVA. Over the past 15 yr, during her tenure with KBR and AVEVA, she has completed more than a dozen simulation projects, provided training for panel operators and assisted in ammonia plant commissioning. The simulation projects included both engineering studies and operator training simulators. She earned BS and MS degrees in chemical engineering from the University of Houston.
Improve stability of ammonia plant steam systems to reduce unscheduled plant shutdowns
Dyno Nobel runs a 2,300-metric tpd purifier plant in Waggaman, Louisiana.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 greenlights new gas plant and fractionator projects, advancing integrated wellhead-to-market strategy 5/18
- OXEA and Air Liquide renew syngas and hydrogen supply agreement for Oberhausen site 5/18
- Commonwealth LNG gets green light to start construction of $13-B, 9.5-MMtpy LNG terminal 5/15
- ARENA to drive Australia's $1.1-B Cleaner Fuels Program 5/15
- Japan’s first green ammonia plant based on KBR’s K-GreeN process now fully operational 5/15
- Repsol's Chairman asserts the role of refining as a strategic industry for Spain and for Europe 5/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

