Guesneux, S.
Use real-time optimization for low-sulfur gasoline production
As the main sulfur source in the gasoline pool, fluid catalytic cracker (FCC) gasoline cuts must undergo severe hydrodesulfurization (HDS) processing to achieve ultra-low-sulfur gasoline (ULSG) pool s..
Increase MTBE plant productivity
Applying advanced process control solutions enabled raising unit output without a major retrofit of existing equipment
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction