Walker, B. A.
Facility siting—balancing risk vs. cost
Companies should take a second look at identifying and analyzing hazards associated with temporary buildings
Optimum console design promotes control room efficiency
New features can enhance traditional functionality, reduce operating costs and foster worker safety
Challenges in control room design
Use these guidelines to reduce shiftwork fatigue and increase operator awareness+
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Fire at Russian petrochemicals plant kills at least three 4/2
- NH3 Clean Energy selects Linde to deliver FEED for the WAH2 project 4/2
- Phelan Green selects Honeywell process technology for flagship South African eSAF facility 4/2
- Metafuels secures Dutch government grant to advance Rotterdam eSAF project 4/2
- Topsoe partners with Hynfra P.S.A. to advance green ammonia in Jordan 4/2
- China calls for independent refiners to maintain fuel output amid war disruption 4/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

