Walker, B. A.
Facility siting—balancing risk vs. cost
Companies should take a second look at identifying and analyzing hazards associated with temporary buildings
Optimum console design promotes control room efficiency
New features can enhance traditional functionality, reduce operating costs and foster worker safety
Challenges in control room design
Use these guidelines to reduce shiftwork fatigue and increase operator awareness+
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Shell Aviation, Accenture, and Amex GBT expand Avelia into a multi-supplier SAF solution 7/16
- ORLEN and Krajowa Grupa Spożywcza sign MoU to accelerate biomethane production in Poland 7/16
- New plants, U.S. trade worries to drive China's 2025 naphtha imports to record 7/16
- Blue Water significantly reduces CO2 emissions by switching to HVO in port operations 7/16
- Swire Shipping launches new carbon insetting program – ‘Voyage to Zero’ 7/16
- China's surplus crude oil surges in June, giving refiners options 7/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction