Abid, J.
Jamshaid Abid is a Piping/Project Engineer with more than 16 yr of experience in project design, engineering, installation and commissioning for onshore oil and gas (greenfield and brownfield developments) and ammonia-urea plants in Iraq, Pakistan, the UAE and Yemen. He holds a BE degree in mechanical engineering from the University of Engineering and Technology in Taxila, Pakistan.
Supply Chain: How to reduce piping inventory
Piping represents a significant part of the plant cost, ranging from 15%–25%.1 Materials stored in warehouses or storage facilities cost companies in terms of personnel, materials, time, space, insurance, risk, etc. This article proposes cost-saving strategies for inventory reduction. Further, it emphasizes consistent naming conventions to avoid creating duplicate/redundant items.
Project Management: Estimate skid and package dimensions
In the absence of vendor quotations or detailed engineering, preliminary dimensions of skids or packages can be estimated quickly using the ratio method.
- 1
- ... 1 pages

- Shell Aviation, Accenture, and Amex GBT expand Avelia into a multi-supplier SAF solution 7/16
- ORLEN and Krajowa Grupa Spożywcza sign MoU to accelerate biomethane production in Poland 7/16
- New plants, U.S. trade worries to drive China's 2025 naphtha imports to record 7/16
- Blue Water significantly reduces CO2 emissions by switching to HVO in port operations 7/16
- Swire Shipping launches new carbon insetting program – ‘Voyage to Zero’ 7/16
- China's surplus crude oil surges in June, giving refiners options 7/16