Aguirre, M.
Maria Aguirre is the General Sales Manager–Latin America for Cowan Dynamics. She has more than 10 yr of expertise in the selection and design of valve automation solutions. Ms. Aguirre earned a master’s degree in engineering from Concordia University in Montreal, Quebec, Canada, and is licensed in Canada as a professional mechanical engineer with the Professional Engineers and Geoscientists of Alberta (APEGA).
Air-to-air pneumatic booster fail-safe system for valves
Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Engineering & Design
/ Equipment
/ Natural Gas
/ Safety
/ Valves
In pneumatic valve automation systems, it is common to hear the following terms for valve positions: “fail open (FO),” “fail close (FC)” and “fail last (FL)”.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

