Blaser, P.
Peter Blaser is Vice President of Engineering Services at CPFD LLC, with 20 yr of experience in developing and applying specialized computational fluid dynamics (CFD) technologies. Since 2010, Mr. Blaser has applied his expertise in fluidization and fluid-particle computational modeling toward refinery troubleshooting and improvements via simulation, with emphasis on the FCCU and related components.
Viva Energy’s Geelong refinery reduces FCCU turnaround risk
Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Refining
/ Catalysts
/ Loss Prevention
/ Management
/ Safety
Change involves risk. Many fluidized catalytic cracking units (FCCUs) can be operated more profitably, but changes to achieve more efficient operations can be risky.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction