Toghraei, M.
Wide design margins do not improve engineering
Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Management
/ Middle East
/ Piping
/ Pumps
/ Reactors
/ Turbines
/ Valves
Engineers use design and safety factors in sizing and specifying instrumentation or major process equipment, such as pumps, valves and compressors. Design factors are applied to cover the uncertainty ..
Overflow systems are the last line of defense
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Carbon Management
/ Loss Prevention
/ Piping
/ Safety
/ Treating
/ Valves
The overflow system is the last line of defense against the excessive container filling. An overflow system consists of an overflow nozzle with internal and/or external piping and, in some cases, a si..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Fertiglobe, Covestro and TA’ZIZ sign MoU to explore strategic ammonia collaboration 2/9
- S-Oil signs nearly $4-B PE marketing deal with SABIC 2/9
- Indonesia's Pertamina launches $7-B natural resources processing initiative 2/9
- Digital Exclusive: Innovative grassroots CDU-VDU configuration—Pioneering energy efficiency and net-zero pathways in modern refineries 2/9
- Update: Union agrees to U.S. refineries contract, averting nationwide strike 2/9
- Schneider Electric unveils EcoStruxure™ Foxboro software defined automation 2/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction