van Beurden, I.
The future of HAZOP study software: Break through the clutter
It is no secret that as part of its “CPL 03-00-014–PSM Covered Chemical Facilities National Emphasis Program,” the US Occupational Safety and Health Administration (OSHA) is conducting ..
Adopting global functional safety standards
Potential operational savings justifies the initial investment
Performing safety life cycle analysis helps mitigate process hazards
Using integrity levels and instrumented functions is necessary for safe process design
'Proven-in-use' criteria for safety instrumented systems
Use these guidelines to qualify equipment
Safety integrity level verification - A PFD average calculation is not enough
Architectural constraints must also be considered
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Perpetual Next appoints Bilfinger as lead consultant for its Methanol Moerdijk project 4/1
- ASRock Industrial and CSI Validate O-PAS™ Systems Management Architecture with the iEP-7020E and AiSMA 4/1
- Heavy equipment for KazMunayGas' Atyrau PE plant ships from Shanghai to Kazakhstan 4/1
- KT Tech awarded early engineering works contract for 60,000-tpy SAF plant in Indonesia 4/1
- OCI Global completes sale of OCI Ammonia Holding to AGROFERT 4/1
- Union workers ratify contract at ExxonMobil's Louisiana (U.S.) refining and chemical complex 4/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

