van Beurden, I.
The future of HAZOP study software: Break through the clutter
It is no secret that as part of its “CPL 03-00-014–PSM Covered Chemical Facilities National Emphasis Program,” the US Occupational Safety and Health Administration (OSHA) is conducting ..
Adopting global functional safety standards
Potential operational savings justifies the initial investment
Performing safety life cycle analysis helps mitigate process hazards
Using integrity levels and instrumented functions is necessary for safe process design
'Proven-in-use' criteria for safety instrumented systems
Use these guidelines to qualify equipment
Safety integrity level verification - A PFD average calculation is not enough
Architectural constraints must also be considered
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction