Laturkar, K.
Kaustubh Laturkar works as an Engineer at the Facility for Rare Isotope Beams, a U.S. Department of Energy (DOE) project in Michigan. He has more than 9 yr of experience working in the field of process engineering, refinery operations, utility systems design and operation, with a special focus on design and commissioning of engineering systems. Laturkar earned an MS degree in chemical engineering from University of Florida and a BE degree in chemical engineering from Panjab University, Chandigarh, India. The author can be reached at kos19188@gmail.com.
Ethanol and benzene extractive distillation simulation on DWSIM utilizing p-xylene as solvent
Ethanol and benzene extractive distillation simulation on DWSIM utilizing p-xylene as solvent
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction