Bloch, K.
Update your reliability performance to meet process safety expectations
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Economics
/ Engineering & Design
/ Europe
/ Management
/ Middle East
/ Safety
Better risk assessment can identify root causes for potential site catastrophes before they occur
Extreme failure analysis: never again a repeat failure
Apply root-cause failure analysis to recurring reliability problems
Dealing with deceptive failure modes
Chemical failure mechanisms can disguise themselves as mechanical and vice versa
HP Water Management: Appreciating the power of water
You need not look hard within a process plant to find key technical and production personnel who overlook improvement opportunities within industrial water systems. This oversight is often rooted in t..
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction