Oude, J. E.
Jelle Ernst Oude Lenferink is the Director of Process Engineering at Fluor in Amsterdam. With 20 yr of experience, he has been leading conceptual studies, FEED and EPC projects, ranging from refinery projects involving hydrocracker technologies to petrochemicals and renewables projects. He studied chemical engineering at the University of Groningen in the Netherlands, and has completed post-graduate work in process design and development at the University of Twente in the Netherlands.
Steam generator in a hydrocracker high-pressure loop—why not?
Environment & Safety
/ Refining
/ Engineering & Design
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Safety
Historically, there has been a perception in the industry that it is not safe to include a steam generator in the high-pressure loop of a hydrocracker.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 greenlights new gas plant and fractionator projects, advancing integrated wellhead-to-market strategy 5/18
- OXEA and Air Liquide renew syngas and hydrogen supply agreement for Oberhausen site 5/18
- U.S. oil refiners finally profit from biofuels due to mandates, high fuel prices 5/18
- China's April oil throughput hits lowest since August 2022, inventories rise 5/18
- Vietnam receives first cargo of Congo Djeno crude for Nghi Son refinery 5/18
- Mexico's Pemex says brief fire at Olmeca refinery controlled, operations normal 5/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

