Srinath, N. R.
N. R. Srinath has more than 14 yr of experience in the design and engineering of heat transfer equipment in the energy and chemical sectors. He began his career with Foster Wheeler India in 2007 and has worked at Fluor New Delhi since 2013.
Case study: Challenges in the selection of a helical baffled exchanger
In a greenfield project, a proprietary heat exchanger<sup>a</sup> has been found to be preferable to conventional shell-and-tube (S&T) exchangers to optimize the total lifecycle cost (i.e., capital, operating, installation and maintenance costs).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- bp's Gelsenkirchen refinery attracts buyer's interest from Klesch 2/10
- Fire at Baiji refinery contained, Iraq's Somo says 2/10
- Hengli Petrochemical sets up Dubai trading subsidiary in expansion 2/10
- Canadian airlines suspend Cuba flights as island set to run out of jet fuel 2/10
- Idemitsu Kosan plans maintenance at Keihin refinery in April 2/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

