Martin, G.
Gary R. Martin is Business Development Manager of Refining Technologies with GTC Technology US LLC. He has been involved in revamps, including conceptual process design and process design packages for large capital revamps, optimization and troubleshooting services to the refining industry worldwide. He previously was President of Process Consulting Services Inc. and worked for Total Petroleum, El Paso Refining and Glitsch Inc. He holds a BS degree in chemical engineering from Oklahoma State University.
Heavy crude oil processing design and reliability
Maintenance & Reliability
/ Acid Gas Removal
/ Corrosion
/ Crude oil
/ Desulfurization
/ Engineering & Design
/ Environment
/ Equipment
/ Hydrogen
/ Process Optimization
/ Piping
/ Refining
/ Reactors
/ Safety
/ Treating
/ Sulfur
Revamping refineries to process heavier crude slates goes well beyond the requirements to meet equipment performance dictated by a shift in the quantity of lighter product yields to heavier products.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras delivers LPG sold at steep premiums despite Lula move to annul auction 4/3
- Plug Power to supply 275-MW GenEco electrolyzer system for Hy2gen’s Courant decarbonized ammonium nitrate project 4/3
- Vietnam refinery boosting jet fuel production 4/3
- China plans to upgrade some petrochemical plants, phase out others by 2029 4/3
- Morocco has diesel stocks for 51 days, energy ministry says 4/3
- Nigeria's Seplat Energy hit by strike amid push for higher output 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

