Martin, G.
Gary R. Martin is Business Development Manager of Refining Technologies with GTC Technology US LLC. He has been involved in revamps, including conceptual process design and process design packages for large capital revamps, optimization and troubleshooting services to the refining industry worldwide. He previously was President of Process Consulting Services Inc. and worked for Total Petroleum, El Paso Refining and Glitsch Inc. He holds a BS degree in chemical engineering from Oklahoma State University.
Heavy crude oil processing design and reliability
Maintenance & Reliability
/ Acid Gas Removal
/ Corrosion
/ Crude oil
/ Desulfurization
/ Engineering & Design
/ Environment
/ Equipment
/ Hydrogen
/ Process Optimization
/ Piping
/ Refining
/ Reactors
/ Safety
/ Treating
/ Sulfur
Revamping refineries to process heavier crude slates goes well beyond the requirements to meet equipment performance dictated by a shift in the quantity of lighter product yields to heavier products.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Britain will not bail out bioethanol industry hit by Trump trade deal 8/15
- Russian energy facilities targeted recently in drone attacks 8/15
- Shell: Norco, Louisiana (U.S.) refinery gasoline unit work to start on Friday 8/15
- Sanctions-hit Indian refiner Nayara in talks with govt to sustain operations 8/15
- The API challenges Trump plan to cut biofuel import credits 8/15
- IAG selects record 29 startups for accelerator program 8/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction