Bhatt, S.
Conduct a design check for depressurization system for cold conditions
Emergency depressurization is a safety provision designed to release gas from a high-pressure system during emergency situations, such as a fire. An overview of cold depressurization is provided, including factors affecting the temperature profiles and critical factors considered while performing the study.
Design a staggered depressurization sequence for flare systems
Emergency depressurization is one of the most important design provisions for safeguarding facilities in case of an emergency. To overcome limitations of flare system capacity during such a scenario, depressurization can be practiced in a sequential manner. Presented here are the criteria and calculation methods for designing sequential depressurization, along with guidelines for the implementation of recommended designs.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 greenlights new gas plant and fractionator projects, advancing integrated wellhead-to-market strategy 5/18
- OXEA and Air Liquide renew syngas and hydrogen supply agreement for Oberhausen site 5/18
- Commonwealth LNG gets green light to start construction of $13-B, 9.5-MMtpy LNG terminal 5/15
- ARENA to drive Australia's $1.1-B Cleaner Fuels Program 5/15
- Japan’s first green ammonia plant based on KBR’s K-GreeN process now fully operational 5/15
- Repsol's Chairman asserts the role of refining as a strategic industry for Spain and for Europe 5/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

