Neomagus, H. W. J. P.
Update temperature control for a Claus unit with neural networks
Environment & Safety
/ Process Control
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Gasoline
/ Greenhouse Gases
/ Heat Transfer
/ Information Systems
/ Loss Prevention
/ Middle East
/ Reactors
/ Safety
The Natref oil refinery in Sasolburg, South Africa, had experienced refractory problems in the sulfur recovery unit’s (SRU’s) combustion chamber since startup (Fig. 1). Even though the SRU w..
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- SIBUR develops new polyethylene grade for FMCG packaging 8/13
- L&T Energy GreenTech partners with Japan’s ITOCHU for 300,000-tpy green ammonia project 8/13
- VINCI wins major contract for innovative biofuels plant in Spain 8/13
- Orlen Unipetrol to shut ethylene unit at Litvinov plant for several days 8/13
- Dangote Refinery cuts fuel price before planned sales to local Nigerian market 8/13
- Chevron Phillips Chemical completes low-viscosity PAO expansion in Belgium 8/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction