Rahimi Mofrad, S.
Rethink your overpressure systems
Consider multiple relief valve designs
What you should know about liquid thermal expansion
Decision flowchart aids in correct thermal relief valve requirements
Tower pressure relief calculation
A practical, less-complicated method for different emergency cases
Relief rate calculation for control valve failure
Use these equations to determine capacity requirements
Designing for pressure releases during fires—Part 2
Wetted equipment requires a different calculation approach for fire relief loads
Designing for pressure releases during fires - Part 1
How to determine if equipment should be considered wetted or unwetted when calculating fire relief load
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction