Baybutt, P.
Paul Baybutt is the founder and CEO of Primatech Inc., a firm that specializes in process safety, security and risk analysis. He holds a PhD from the University of Manchester in England.
Process safety incidents involving simultaneous operations
Environment & Safety
/ Petrochemicals
/ Refining
/ Safety
/ Pumps
/ Reactors
/ Management
/ Loss Prevention
/ Heat Transfer
/ Equipment
/ Environment
/ Corrosion
/ Compressors
/ Acid Gas Removal
Some process safety incidents occur as the result of simultaneous or sequential occurrences of operations or activities that interfere or clash with each other.
Process safety incidents, cognitive biases and critical thinking
Environment & Safety
/ Maintenance & Reliability
/ Process Control
/ Economics
/ Environment
/ Loss Prevention
/ Management
/ Safety
Process hazard analysis (PHA) is performed to identify possible hazard scenarios that may occur in a process.
Implement a competency management system for process safety
Managing the competency of company personnel is a critical aspect of process safety.
Cyber security: Are your computer control systems safe from attack?
Performing a CSVA identifies vulnerabilities and needed security measures
Human factors analysis for process safety
Apply LOPA-HF to a fired furnace
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

