Barletta, T.
Consider retrofits to handle high-viscosity crudes
Refiners must fine-tune crude unit process design and energy balance to process a heavy feedslate
Pump cavitation caused by entrained gas
Here's how the problem was solved on an FCC main fractionator
Consider comprehensive CPD efforts to cut costs
With performance real-time field data, designers can devise process retrofits at the conceptual stage that control project scope and minimize engineering revisions during FEED and detailed engineering
Diagnose flooding columns efficiently
Using field pressure data, a refiner made a low-capital modification on a crude distillation column to increase throughput without a shutdown
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

