Martin Veen is a Senior Solutions Architect with Prometheus Group. Until November 2019, he was Managing Director at RoserConSys BV, a company specializing in turnarounds, shutdowns and outages (STO) software. When Prometheus Group acquired RoserConSys BV in December 2019, Mr. Veen took on the role of STO advisor.
Project Management: Four tips for navigating a shutdown, turnaround or outage successfully
Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Project Management
/ Refining
/ Economics
/ Loss Prevention
/ Management
/ People
/ Safety
In the oil and gas sector, managing a shutdown, turnaround, or even an outage is an unavoidable requirement.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction