Veen, M.
Martin Veen is a Senior Solutions Architect with Prometheus Group. Until November 2019, he was Managing Director at RoserConSys BV, a company specializing in turnarounds, shutdowns and outages (STO) software. When Prometheus Group acquired RoserConSys BV in December 2019, Mr. Veen took on the role of STO advisor.
Project Management: Four tips for navigating a shutdown, turnaround or outage successfully
Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Project Management
/ Refining
/ Economics
/ Loss Prevention
/ Management
/ People
/ Safety
In the oil and gas sector, managing a shutdown, turnaround, or even an outage is an unavoidable requirement.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Shell Aviation, Accenture, and Amex GBT expand Avelia into a multi-supplier SAF solution 7/16
- ORLEN and Krajowa Grupa Spożywcza sign MoU to accelerate biomethane production in Poland 7/16
- New plants, U.S. trade worries to drive China's 2025 naphtha imports to record 7/16
- Blue Water significantly reduces CO2 emissions by switching to HVO in port operations 7/16
- Swire Shipping launches new carbon insetting program – ‘Voyage to Zero’ 7/16
- China's surplus crude oil surges in June, giving refiners options 7/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction