Kwon, O.
Ohgeon Kwon is a Principal Consultant and Structural Integrity Team Lead at Quest Integrity. Dr. Kwon has more than 25 yr of experience and expertise in high-temperature creep, FFS and remaining life assessments for various components in the petrochemical, refining and power generation industries. He earned his PhD at Imperial College, London.
Case studies: Evaluation of the soundness and remaining life of PSA vessels with weld defects
Multiple defects were found in pressure swing adsorption (PSA) vessels during an outage of one of four PSA process units.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Shell Aviation, Accenture, and Amex GBT expand Avelia into a multi-supplier SAF solution 7/16
- ORLEN and Krajowa Grupa Spożywcza sign MoU to accelerate biomethane production in Poland 7/16
- New plants, U.S. trade worries to drive China's 2025 naphtha imports to record 7/16
- Blue Water significantly reduces CO2 emissions by switching to HVO in port operations 7/16
- Swire Shipping launches new carbon insetting program – ‘Voyage to Zero’ 7/16
- China's surplus crude oil surges in June, giving refiners options 7/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction