Babakr, A.
Investigation: Failure of a steam generator
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Boilers
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Utilities
In case history, engineers search for root cause of water-side tube failures for a 23-year-old boiler
Flow-induced fatigue failure
Case histories describe a variety of failures and solutions
Failure analysis of above-ground storage tank bottom plates
Here are the field performance assessments and remedial measures
Effect of process deposits on the corrosion behavior of titanium in brine
The temperature and pH need to be controlled to avoid problems
Failure analysis of a primary reformer riser
Investigation revealed the root cause was creep rupture
Top of line corrosion in industrial wastewater pipelines
Here are the causes and the solution
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction